Skip to content
Family-owned in Plano • Serving Dallas–Fort Worthinfo@allamericanhomerenovators.com214-206-7005
Your Home Deserves an A+ Upgrade! 25% Off Your Entire Project OR Interest-Free Financing • Through 8/31/2026: Get a $2,000 Bonus.See offer details →
Skip to content
Summer Savings Event — Ask about current bathroom remodeling promotions and financing options. See details
Turnkey Bathroom Remodeling • Dallas–Fort Worth

Beautiful bathrooms designed around how you live.

From a focused tub-to-shower conversion to a complete primary-suite remodel, AAHR coordinates design, demolition, plumbing, electrical, waterproofing, products, installation, glass, finishing details, cleanup, warranty, and care.

Family-OwnedPremium ProductsTurnkey ManagementWarranty & Care
Full bathroom remodel completed by All American Home Renovators
Actual AAHR Project • Full Bathroom Remodel + Replacement Windows
3–5 DaysTypical wet-area projects
7–10 DaysTypical enlarged wet area
3 Weeks or LessTypical full turnkey remodel
One Accountable TeamDesign through walkthrough
Real Before & After

See the project type and the transformation together.

Full Bathroom Remodel

Boucha primary bathroom transformation

A full-room remodel coordinated the shower, tub, vanity, flooring, lighting, glass, and replacement windows.

Full bathroom remodel beforeBefore
Full bathroom remodel afterAfter
Tub-to-Shower Conversion

Walk-in shower plus linen storage

An oversized tub was removed to create a more useful shower and a coordinated linen closet.

Tub to shower conversion beforeBefore
Tub to shower conversion afterAfter
What Homeowners Say

Real reviews placed with the right service.

★★★★★
“I'm so obsessed with it! Honestly, I could live in my bathroom.”
Jordan Boucha
★★★★★
“It feels like I'm in a hotel.”
Sarah Wren
★★★★★
“Thank you for your extraordinary professionalism and commitment to my project, my home.”
Shelley Colon
Bathroom Remodeling FAQs

Clear answers before the consultation.

How long does a tub-to-shower conversion take?

Targeted wet-area projects are typically completed in approximately 3–5 days, subject to scope, inspections, materials, and conditions discovered after demolition.

How long does a full bathroom remodel take?

A complete turnkey bathroom remodel is typically completed in approximately three weeks or less, depending on scope, product availability, inspections, and existing conditions.

Do you help with design selections?

Yes. AAHR can coordinate cabinets, countertops, flooring, shower walls, fixtures, glass, mirrors, lighting, paint, ventilation, storage, and accessibility details.

Do you provide warranty and care documents?

Yes. Final project documents may include workmanship information, manufacturer documents, product records, cleaning guidance, and the service-request process.

Ready to start?

Plan the right project before you spend.

Schedule a complimentary consultation for your bathroom, windows, or exterior doors.

CallEstimateBook
Complimentary Consultation

Ready to compare the right products for your home?

Talk with our team about bathroom remodeling, replacement windows, patio and entry doors, or siding.

CallTextBook