These typical construction ranges help homeowners understand the general sequence. Every schedule remains subject to the final scope, product availability, inspections when applicable, existing conditions, and approved changes.
Tub-to-Shower Conversion
Typically 3–5 days
Tub-to-Shower Conversion
Day 1: demolition, plumbing, and preparation
Day 2: waterproofing, base, and wall system
Day 3: fixtures, trim, and finish work
Days 4–5 when needed: glass, cleanup, and walkthrough
Walk-In Shower Remodel
Typically 3–5 days
Walk-In Shower Remodel
Protect the home and remove the existing wet area
Complete plumbing, substrate, and waterproofing
Install shower surfaces, floor, niche, and fixtures
Install glass, complete cleanup, and review care instructions
Bathtub Replacement
Typically 3–5 days
Bathtub Replacement
Remove the old bathtub and inspect the surrounding area
Complete plumbing and preparation
Install the new bathing system and wall finishes
Finish trim, cleanup, and homeowner walkthrough
Enlarged Wet Area
Typically 7–10 days
Enlarged Wet Area
Demolition and layout changes
Plumbing, framing, substrate, and waterproofing
Surfaces, fixtures, storage, and finish carpentry
Glass, final details, cleanup, and walkthrough
Full Turnkey Bathroom Remodel
Typically 3 weeks or less
Full Turnkey Bathroom Remodel
Design confirmation and site protection
Demolition, framing, plumbing, and electrical
Waterproofing, shower, flooring, cabinets, and countertops
Lighting, mirrors, glass, paint, trim, cleanup, and final documentation
All American Home Renovators
Plan the Right Scope for Your Home
Schedule a complimentary in-home design consultation with All American Home Renovators.
Original project photographs, renderings, written content, and marketing materials may not be reproduced or used commercially without prior written permission.