Skip to content
Family-owned in Plano • Serving Dallas–Fort Worthinfo@allamericanhomerenovators.com214-206-7005
Your Home Deserves an A+ Upgrade! 25% Off Your Entire Project OR Interest-Free Financing • Through 8/31/2026: Get a $2,000 Bonus.See offer details →
Complimentary Design Consultations • Financing Options Available
Walk-In Shower Remodel

Collins Walk-In Shower Remodel

A dated shower was rebuilt as a polished walk-in shower with coordinated surfaces, storage, fixtures, and glass.

Walk-In Shower Remodel – completed Collins Walk-In Shower Remodel
Walk-In Shower Remodel before remodeling – Collins Walk-In Shower Remodel
Walk-In Shower Remodel — Before
Walk-In Shower Remodel after remodeling – Collins Walk-In Shower Remodel
Walk-In Shower Remodel — After
Homeowner Goals

What the project needed to accomplish

  • Replace the dated enclosure
  • Improve daily usability
  • Add built-in storage
  • Create a cleaner, brighter look
AAHR Design Solution

How the space was transformed

  • Waterproof shower reconstruction
  • Built-in niche and coordinated fixtures
  • Custom glass enclosure
  • Large-format wall surfaces
  • Detailed trim and finish work
Project Gallery

Completed walk-in shower remodel details

Every image is labeled by project type and includes descriptive image text for visitors and search engines.

Materials & Features

Selections that define the project

  • Marble-look wall surfaces
  • Mosaic shower floor
  • Custom glass
  • Built-in niche
  • Premium shower fixtures
Typical Timing

Typically 3–5 days for many wet-area projects

Actual timing depends on project scope, custom selections, fabrication, inspections, site conditions, and approved changes.

Ready to transform your home?

Schedule a complimentary design consultation for your bathroom, windows, or doors.

CallTextBook
Complimentary Consultation

Ready to compare the right products for your home?

Talk with our team about bathroom remodeling, replacement windows, patio and entry doors, or siding.

CallTextBook